top of page

TESTIMONIALS

Quality Service = Outstanding Results

In 2020-21, we had a pipeline project in the Portland Texas area, with multiple directional crossings. Isaacks D.D. was selected to make these drills ranging from, 1000 feet up to 6400 feet in length. They were very conscientious about having a good hole, and would not pull until they were satisfied it was right. We had zero issues getting pipe in the ground with them. I look forward to working with them again in the future.

Vernon Eldridge - Pipeline Construction Manager -    Air Liquide 

Testimonials: Testimonials
bottom of page